Global One-Stop Building Material Partner
Mulan Build | A George Group Sub-Brand
Turn your floor plan into a ready-to-ship full-house package—fast, smart, global.
Who We Are
Mulan Build Group Sub-Brand,Build for Whole-House Project
Founded in 2006 and headquartered in Chancheng, Foshan, Guangdong (Yimeijia Sanitary Ware World), Mulan Build delivers one-stop, whole-house solutions—design-matched, factory-direct, and code-ready.
As part of George Group, we share everything like supply chain, engineering know-how, and project experience, so you receive group-level delivery capacity with brand-level service stability.
Fast Facts
30,000 m² physical showroom covering all building materials
1000+ staff & designers, project teams on standby
1,000+ projects/year successfully delivered
35–45 days typical lead time (project-based scheduling)
Single project manager from pre-sale to after-sale
Factory direct pricing & quality control
What We Deliver
Complete house packages across: custom cabinets, doors & windows, staircases, stone, tiles, furniture, soft furnishings, and sanitary ware.
Flexible MOQ—we build to your needs; Even a set of cabinets is fine.
Why Mulan Build
- One Contract, Whole House – design, production, shipping, and after-sales handled by one team.
Design-Driven Delivery – we accept CAD files and provide 2D/3D development, iterating until you’re happy.
Engineering-Grade Fit-Out – room-by-room BOM, labeling, and packing for “arrive & install”.
Reliable Schedule – standard 35–45 day lead time with coordinated production.
Global Logistics – common ports Nansha / Zhongshan; LCL/FCL, FOB/CIF/DDP as requested.
After-Sales With Accountability – your same PM handles replacement, reshipment, or refund according to the real situation—no hand-offs.
Inside Mulan Build: 323,000 sq ft One-Stop Building Materials Showroom Tour
How We Work (5-Step Service Process)
1. Brief & Survey
Share CAD/plans, style, budget; we confirm key measurements (on-site or remote).
2. Design & Quote (7 Days)
Deliver concept plan + material direction + preliminary quote within 7 working days.
3. Confirm & Contract
Finalize 2D/3D, BOQ, and finishes; sign one contract, assign your dedicated PM.
4. Manufacture & QC (35–45 Days)
Scheduled production with in-process QC, room-by-room packing/labeling, progress updates.
5. Ship & Support
LCL/FCL, FOB/CIF/DDP as needed; loading supervision, installation guidance, and 24/7 after-sales handled by the same PM (Project Manager).
Start Your Project (What to Prepare)

Your Floor Plan
You can upload your project floor plan through any contact us button on this website.

Project Location
It helps us understand the transportation regulations and other details of the project location and match the transportation plan that suits you.

Style and Material Preferences
When you send an email, you can tell us which material, style and design you prefer.

Budget range
If you can tell us your budget, we will be able to match you with the right product quickly.
Contact Us
We’ll get back to you within 24 hours. For urgent project inquiries, contact us directly at +86 150 1310 1240. You can also upload your project drawing files




